• Hamad Port
    Hamad Port Opening Ceremony in Qatar,
    September 5,2017
  • First container vessel
    Hamad Port’s first container vessel,
    the MSC Esthi berthed at Container Terminal 1.
    At 337m long with a beam of 46m, a draft of
    15m and a capacity of 9,200 TEUs, the MSC Esthi
    is the largest container vessel, to dock in
    Qatar. The arrival marked the opening
    of Container 1 and the commencement of full
    operations at Hamad Port on 1 December 2016.
  • Full operations
    1 December 2016 marked the start of full
    operations at Hamad Port. An opening reception
    was attended by HE the Prime Minister and
    and Minister of Interior, HE the Minister of Transport
    Transport and Communications, Cabinet Ministers,
    NPP Steering Committee members and NPP Management,
    to witness the arrival of the MSC Esthi.
  • Early operations
    The first ‘ro-ro’ cargo vessel arrived on
    24 December 2015 and the ship’s arrival was
    marked by an inauguration ceremony attended by
    HE the Prime Minister and Minister of Interior
    Sheikh Abdullah bin Nasser bin Khalifa Al-Thani,
    HE the Minister of Transport
    Jassim bin Saif Ahmed al-Sulaiti, ,
    other Minister’s and Steering Committee Members.
  • Early operations
    The first commercial vessel arrived
    at Hamad Port on 24 December 2015.
    This date marks the opening of the
    port for commercial vessels and is a
    major milestone for the Project.
  • Hamad Port
    The first ship to enter Hamad Port arrived on 19 July
    2015,delivering the first four Ship to Shore Cranes
    and eight Rubber Tyred Gantry Cranes from
    Shanghai.The ships arrival was witnessed by the
    Prime Minister and Minister of Interior HE Sheikh
    Abdullah bin Nasser Al-Thani, the Minister of
    Transport,HE Jassim Bin Saif Al Sulaiti, the New
    Port Project Steering Committee members and other
    dignitaries.MWANI, supervised the arrival of the
    first ship in to Hamad Port.
  • Hamad Port
    The first ship to enter Hamad Port arrived on 19 July
    2015,delivering the first four Ship to Shore Cranes
    and eight Rubber Tyred Gantry Cranes from
    Shanghai.The ships arrival was witnessed by the
    Prime Minister and Minister of Interior HE Sheikh
    Abdullah bin Nasser Al-Thani, the Minister of
    Transport,HE Jassim Bin Saif Al Sulaiti, the New
    Port Project Steering Committee members and other
    dignitaries.MWANI, supervised the arrival of the
    first ship in to Hamad Port.
  • Hamad Port
    The New Port Project celebrated the flooding of the
    Port Basin at a ceremony on site where Deputy
    Emir HH Sheikh Abdullah bin Hamad Al Thani
    unveiled the name of the New Port as ‘Hamad Port’.
    Dignitaries in attendance at the ceremony included
    the Prime Minister and Interior Minister
    HE Sheikh Abdullah bin Nasser bin Khalifa Al Thani,
    the Minister of Transport and Chairman of the NPP
    Steering Committee, HE Jassim bin Saif Al Sulaiti,
    number of other Ministers, Ambassadors and
    Officials.
  • The Excavated Port Basin
    Excavation of the 17m deep Port Basin
    was completed in January 2015. A total of
    71 million3 of sand and rock material was
    excavated with 35,224 pre-cast blocks
    placed to construct the quay wall.
  • Filling the Port Basin
    The filling of the Port Basin commenced
    on 9 February with approximately 76 million m³
    of water required to fill both the Port Basin
    and Access Channel, which is now completed.
  • Completing the Quay Wall
    In August 2014, China Harbour Engineering
    Company completed construction of the
    Port quay wall. The completed quay wall
    stands 8.5km long and 22m high. A total of
    35,224 pre-cast concrete blocks, each
    weighing between 60 and 110 tons are
    installed in the quay wall.

BUY AND SELL CRYPTO LEETCODE

On 19 June 2007 His Highness Sheikh Hamad Bin Khalifa Al Thani, Emir of the State of Qatar, issued Emiri Decree No. 37, setting forth the creation of one of the world's largest greenfield port developments. Strategically located south of Doha, the QAR 27 Billion (USD 7.4 Billion) megaproject, which includes a new port, a new base for the Qatar Emiri Naval Forces and the Qatar Economic Zone 3, will span a 26.5 square kilometer area.

LOOM CRYPTO

The New Port Project (NPP) Steering Committee and AlJaber Engineering (JEC) signed a contract for designing and constructing food security facilities and warehouses at Hamad Port at a cost of QAR 1.6billion. HE Jassim Saif Ahmed Al-Sulaiti, Minister of Transport and Communications and Chairman of the NPP Steering Committee witnessed the signing ceremony, held at the Ministry headquarters today. The facilities of the project will be developed and constructed on an area of approximately 53 hectares (about 530,000 square meters). The project consists of specialized facilities for the processing, manufacturing and refining of rice, raw sugar and edible oils. These products will be available for local, regional and global use. For further details, please click here.



1 December 2016 marked the start of full operations at Hamad Port. An opening reception was attended by the Prime Minister and Interior Minister HE Sheikh Abdullah bin Nasser bin Khalifa Al Thani, the Minister of Transport and Communications, Cabinet Ministers, NPP Steering Committee members and NPP Management, to witness the arrival of the Container Vessel MSC Esthi.











REAL ESTATE CRYPTO


3 December 2017

SHIBA NEWS NOW

The Hamad Port Project Tender Committee invites companies to register their interest to participate in the Tender for the Design, manufacture and installation of port wide facilities and buildings (identification and way-finding) signage. The advert can be viewed gate io. The closing date for the registration is 21 December 2017.

1 December 2016

MOST UNDERVALUED CRYPTO

1 December 2016 marked the start of full operations at Hamad Port. An opening reception was attended by the Prime Minister and Interior Minister HE Sheikh Abdullah bin Nasser bin Khalifa Al Thani, the Minister of Transport and Communications HE Jassim bin Saif Al Sulaiti, Cabinet Ministers, NPP Steering Committee members and NPP Management, to witness the arrival of the Container Vessel MSC Esthi.

15 October 2016

COINBASE DEVELOPER PLATFORM

Hamad Port commenced general cargo operations on 15 October 2016 at the General Cargo Terminal, allowing for further operations to be transferred from Doha Port.

24 December 2015

R2B2 CRYPTO

On 24 December 2015, Hamad Port was officially opened for early partial operations.

The first ‘ro-ro’ cargo vessel arrived on 24 December 2015 and the ship’s arrival was marked by an inauguration ceremony attended by HE the Prime Minister and Minister of Interior Sheikh Abdullah bin Nasser bin Khalifa Al-Thani, HE the Minister of Transport Jassim bin Saif Ahmed al-Sulaiti, other Minister’s and Steering Committee Members.

26 February 2015

BITCOIN TL

The New Port Project celebrated the flooding of the Port Basin at a ceremony on site where Deputy Emir HH Sheikh Abdullah bin Hamad Al Thani unveiled the name of the New Port as ‘Hamad Port’. Dignitaries in attendance at the ceremony included the Prime Minister and Interior Minister HE Sheikh Abdullah bin Nasser bin Khalifa Al Thani, the Minister of Transport and Chairman of the NPP Steering Committee, HE Jassim bin Saif Al Sulaiti, and a number of other Ministers and Ambassadors.